Turned parts processing steps

Jun 27, 2018

Leave a message

Today we further understand the specific processing steps of turning parts

The turning part machining program is a very important process in the part processing. It needs to carry out the machining according to certain principles. We will analyze the machining steps of the turning part before operation, during operation, and after operation.


First, before operation


1. Operators must wear relevant protective equipment in strict accordance with the operating rules;

2. The operator must check whether the various parts of the electric appliance are normal before operation, and it can be started after determining that there is no problem.


Second, in operation


1, to ensure the operation of the workpiece clamping firm, such as tools, workers, clips and other parts;


2. All types of machine tools should be idled at low speed after starting up to ensure that no problems can be performed after the machine is started.


3. It is forbidden to put other unrelated things on the machine bed;


4, the operator can not remove excess iron scraps by hand, should use special tools to clean, but also to stand in a safe position, to avoid the iron shavings splashing when the machine is moving;


5. During the operation of the machine tool, the operator is forbidden to adjust the transmission or change the operation stroke. It is not possible to touch the working surface in the process with the hand. The measurement size cannot be used during operation, and the item cannot be transferred across the transmission section of the machine tool.


6, in the processing process, we must strictly abide by the operating rules, must not leave the job when the machine is running, you need to cut off the power when leaving, adjust the speed, travel, tools, etc. have to stop, can not be carried out when the machine is running.


Third, after the operation


1. After the operation is completed, it is necessary to cut off the power supply, remove the cutter, return the handles of all parts to neutral, and lock the electric gate.


2.Clean the iron scraps of the equipment, and inject the lubricant into the guide rail to prevent rust